Tawahiri House - Dance School Facilities Fit-Out

Fast, durable GIB installation for high-use commercial changing rooms and amenities

Category

Commercial

Size

110 m²

Duration

2 days – Team of 2

Scope

GIB Installation – Changing Rooms & Amenities

Overview

Te Marua Linings was engaged to complete the interior lining fit-out for a performing arts school upgrading its changing rooms, toilets, and shower facilities. The project required fast, precise installation to meet the school’s reopening timeline while ensuring durability for high-use spaces. We installed Standard GIB across general wall areas and Aqualine GIB throughout wet zones to provide long-term moisture resistance. With compact room layouts and a strict deadline, this project showcased our ability to deliver commercial-quality workmanship with speed and accuracy.Each house required tailored installation — Lot 41’s 4 m-high ceilings demanded scaffolding and precision sheet placement, while Lot 32 included a diaphragm ceiling for structural bracing. Joints were aligned to manage natural light, and all work was completed to GIB Book standards. Both homes were finished within a week, showcasing efficient delivery and seamless finishes across 200 m²-plus family homes.g Standard GIB throughout living areas and Aqualine GIB in wet zones for moisture resistance.

GIB Installation

Changing Room

The changing rooms were the largest dry-area component of the project and required a finish that was both durable and visually clean. Due to the narrow geometry of each room, sheet layout, handling and movement had to be carefully planned to avoid unnecessary joins and achieve a crisp, high-traffic-ready surface.

Key Details

Challenges

1. Compact Room Geometry

Narrow spaces made sheet handling and access difficult.

2. High Wear-and-Tear Requirements

Changing rooms are subject to continuous daily use.

3. Strict Reopening Timeline

Work needed to be completed in under 48 hours.

Solutions

1. Vertical Sheet Orientation

Improved handling and created stronger, continuous wall lines.

2. Reinforced Fixing Patterns
Added fixings in vulnerable impact zones for improved durability.

3. Optimised Two-Person Workflow

Tasks divided between installers to maintain speed and consistency.

Aqualine GIB Installation

Toilets & Shower Block

The wet-area fit-out required the highest level of moisture resistance and accuracy due to the presence of showers, plumbing fixtures, and constant condensation. Aqualine GIB was chosen for its water-resistant core, and installation had to accommodate numerous penetrations and fixture cut-outs while maintaining a seamless substrate for waterproofing and tiling.

Key Details

Challenges

1. High Moisture Exposure

Constant humidity and water contact required a robust system.

2. Multiple Plumbing Cut-Outs

Showerheads, mixers, drains, and pipes increased installation complexity.

3. Limited Working Space

Tight access around fixtures and cubicles required careful move

Solutions

1. Full Aqualine System

Provided long-term moisture resistance and structural stability.

2. Laser-Guided Measurements
Ensured precise cut-outs without compromising board strength.

3. Pre-Cut Material Preparation

Reduced on-site adjustments and allowed for a cleaner installation.

Project Conclusion

The Tawahiri House upgrade highlights Te Marua Linings’ ability to deliver high-quality finishes under tight commercial timeframes. Through efficient sequencing, moisture-resistant systems, and precise installation, both the changing rooms and wet areas were completed to a professional standard within just two days. The result is a robust, clean, and long-lasting interior that supports the daily demands of a busy performing arts school and reflects the reliability of our commercial fit-out capability.

Start With a Conversation

Get in touch today and experience straightforward, reliable GIB fixing services in Wellington. We’re here to make it easy.

✓ Submission Details

28 Jan 2026, 2:45 PM

Building Type
Standalone House
Project Type
New Build
Number of Homes
Just my home
Number of Stories
Two
Floor Area (m²)
250
Rooms
3 bedrooms, 2 bathrooms
Skylight
Yes
Natural Light
Yes
Additional Comments
Looking for sustainable building materials and energy-efficient solutions.

Questions? Contact us at support@example.com or call 1-800-EXAMPLE

Contact us

Talk to our Wellington team today. We’re ready to help make your plasterboard fixing project straightforward, reliable, and stress free.