37 Taft Street – Ten Townhouse Development

Weatherline and GIB installation across two multi-unit residential blocks

Category

Commercial / Residential Hybrid

Size

10 Townhouses (Two Blocks of Five Homes Each)

Duration

2 months

Scope

Weatherline System + Full GIB Installation

Overview

The 37 Taft Street development consists of ten modern two-storey townhouses, delivered in two blocks of five homes each. Te Marua Linings was contracted to complete both the Weatherline external substrate and full internal GIB lining for all units.
This multi-unit project required consistent quality across repeated floor plans, coordinated sequencing between exterior and interior work, and efficient handling of materials across two storeys. Despite the scale and logistical complexity, the project was completed within a two-month timeframe, demonstrating our capability in medium-density residential construction.

Weatherline + GIB Installation- 80–90 m² Units

Block 1 - Five Townhouses

Block 1 consisted of five compact two-storey units, each averaging 80–90 m². These homes featured repeatable layouts, allowing our team to streamline installation processes while maintaining finish consistency. The smaller floor area increased the need for precise material handling and efficient sequencing.

Key Details

Challenges

1. Compact Internal Layouts

Tight working areas made sheet rotation and fixing more difficult.

2. High-Volume Repetition

Ensuring identical finish quality across five units required strict systemisation.

3. Exterior–Interior Scheduling Dependency

Weatherline work had to be fully completed before internal lining could begin.

Solutions

1. Room-by-Room Sequencing

Completed each room in a fixed order to maximise space and reduce handling issues.

2. Standardised Workflow Model
Developed a repeated installation pattern for all five units, maintaining identical fixing, joint placement, and sheet orientation.

3. Coordinated Exterior-to-Interior Timelines

Weatherline teams completed each unit sequentially, allowing GIB installation to begin without delays.

80–90 m² Units

Block 2 - Five Townhouses

Block 2 mirrored the layout of Block 1 but included more elevated working areas and external height challenges. The Weatherline system required meticulous fixing patterns due to exposure zones, and the GIB installation demanded clean joint alignment to maintain a consistent look across the block.

Key Details

Challenges

1. Elevated Working Areas

Higher exterior points required scaffold shifts and careful access planning.

2. Bracing and Fixing Complexity

Certain façades needed more fixings due to wind exposure.

3. Material Handling Up Two Storeys

GIB sheets required safe transport to upper floors without damaging edges.

Solutions

1. Pre-Planned Scaffold Setups

Scaffold zones planned ahead of time to minimise downtime and ensure safe access.

2. Enhanced Fixing Patterns

Followed manufacturer instructions strictly for exposed elevations to guarantee structural integrity.

3. Controlled Manual Lifting Systems

Utilised two-person teams for sheet carry and implemented padded lift points to prevent sheet damage.

Project Conclusion

The 37 Taft Street development demonstrates Te Marua Linings’ efficiency and consistency across multi-unit residential construction. By standardising processes across ten nearly identical townhouses and coordinating exterior and interior installations, we achieved high-quality, uniform finishes throughout both blocks. Despite access challenges, compact layouts, and repeated unit requirements, the project was delivered on schedule and to a consistently high standard — reinforcing our capability in medium-density developments and large-scale multi-home delivery.

Start With a Conversation

Get in touch today and experience straightforward, reliable GIB fixing services in Wellington. We’re here to make it easy.

✓ Submission Details

28 Jan 2026, 2:45 PM

Building Type
Standalone House
Project Type
New Build
Number of Homes
Just my home
Number of Stories
Two
Floor Area (m²)
250
Rooms
3 bedrooms, 2 bathrooms
Skylight
Yes
Natural Light
Yes
Additional Comments
Looking for sustainable building materials and energy-efficient solutions.

Questions? Contact us at support@example.com or call 1-800-EXAMPLE

Contact us

Talk to our Wellington team today. We’re ready to help make your plasterboard fixing project straightforward, reliable, and stress free.